Supply chain paradigm shift needed to protect revenue

AN ANALYSIS by Henk de Vos

The supply chain function has traditionally been considered as a non-cash generating business unit with its primary function centred around reducing cost. But what happens when the company’s supply chain impacts the company’s ability to generate revenue?

Globalisation and disruption

Global supply lines are changing daily due to environmental, economic, and political factors, and while there have always been supply chain disruptors, they have tended to be more isolated events, and short-midterm work-around solutions could address them. Globalisation saw the consolidation of local manufacturing operations into national, and eventually global players. This resulted in an increasing number of companies outsourcing non-core manufacturing and thereby becoming totally reliant upon global suppliers.

2022 calls for a new approach

This model has worked well, albeit the occasional disruptor for the past 20 years, with companies largely ignoring their business continuity planning due to plentiful supply options. The COVID-19 pandemic was the first real challenge as it impacted the whole world, not just a subset. It impacted everything from the supply of raw materials to manufacturing, the associated logistics and the ability to communicate with outsourced service providers. In addition, the world has experienced a multitude of unprecedented natural disasters and now the biggest political conflict in Europe since World War II and increasing tensions within the Asia Pacific region.

Adaption is key to survival

The world has and continues to change at a profoundly fast pace. Companies that fail to make the required paradigm switch (significant change in a fundamental model or perception of events) to adapt may not survive. Indeed, supply chain has become a critical function of business today. The days of cost-saving have changed. Do your supply chain team have the right skills to build strong business partnerships while managing business continuity planning?

In 2022, a company’s future depends on its supply chain team as it is now a cornerstone that underpins the ability to generate revenue.

Shifting energy

Critical Input Senior Consultant Russell Wood will be attending Energy Networks Australia’s Conference at the Brisbane Convention & Exhibition Centre from March 16-18, 2022. We caught up with him to hear his thoughts on what’s been happening within the sector, and if indeed, we’re living through a watershed moment.

There have been some interesting developments recently within the energy sector.

There’s been a fundamental shift for energy generation, transmission and the entire energy supply chain. While Australia has been a laggard, the shifts in Europe from the EU Green Deal, and Biden’s Clean Energy Revolution in the US have altered policy direction globally. The region and Australia will play their part in this and these all set the background for interesting moves such as the recent AGL and Origin happenings.

Is this signalling a major turning point in Australia’s energy economy?

We’re going green, but precisely when and how are not yet certain. In particular Origin’s sudden move raises some questions. Currently, about 51% of the required replacement supply to shut down Eraring is unconfirmed and uncertain. This means that a significant amount of stable base-load supply (from other sources) needs to be commissioned within three years. Further, Origin’s CEO repeatedly emphasised within his press appearances that pricing for base-load power compared to renewables (effectively subsidised) was unsustainable at current levels. Is this signalling that the regulator needs to review stable base-load prescribed pricing versus transient renewable generation? And despite New South Wales’s massive renewables funding just announced, if replacement supply isn’t confirmed as the 2025 deadline approaches, does Origin then delay the closure?

What are you interested in exploring at the conference?

Our main goal is of course networking with key connections and decision-makers across the energy supply chain. More specifically, we’re interested in learning about new generation components and systems that will go into the grids of the future. This includes generation, transmission, sub-stations, and secondary systems/communications. The materials management approach and lifecycle planning around these components is a key focus.

Where does Critical Input fit within the energy sector?

Critical Input has vast experience dealing with utilities, regulated asset operators and critical infrastructure organisations within Australia and the region. We have solid experience and expertise within the energy sector also. We’re interested in just reminding people of who we are and what we do plus how we can achieve savings and efficiency gains with materials management, planning and logistics across the energy supply chain. If you’re planning on attending, shoot me an email at [email protected] and we can grab a coffee.

A white paper: Exploring contract models

Choosing the right contracting model is critical to the successful delivery of a project. Senior Consultant Melanie Purcell explores the various models and takes a deep dive into the pros and cons of Early Contract Involvement (ECI).

By Critical Input Senior Consultant Melanie Purcell

Early Contractor Involvement (ECI)

CI is a collaborative or relational procurement method that seeks to obtain the benefit of the contractor’s specialist knowledge in the early planning and design phases of the project. Under an ECI arrangement, the contractor is engaged for a fee as a contribution towards its tendering costs. At this point, the project cost isn’t known because design is typically not yet finalised. In effect, an ECI is considered a process that leads to another form of contract, rather than a contract itself.

How ECIs intersect with other contracts

Besides ECIs, other common contracting models used in infrastructure projects – each with its own pros and cons – include:

  • Construct only
  • Design and Construct (D&C)
  • Early Contractor Involvement (ECI) then Construct or partial D&C
  • Engineering, Procurement and Construction (EPC)
  • Engineering, Procurement and Construction Management (EPCM)
  • Design Build Finance Operate (DBFO) / Build Own Operate (BOO) / Public Private Partnerships (PPP) (and other variations)
  • Managing Contractor
  • Alliance.

While ECI is the common “umbrella” term used, there are several ECI models. The key differences relate to the number of tenderers and whether it will culminate in a “Construct only” or a detailed “Design and Construct” (D&C) contract. Early Tender Involvement (ETI) generally leads to Construct only contracts. Typically, two or three competing contractors are invited to review the principal’s preliminary design, provide constructability inputs, and undertake value engineering. The principal and its designer amend the detailed design after considering market input. Competing contractors then offer a schedule of rates or lump sum prices based on the refined tender documentation.

Generally, a Construct only (ETI) model is preferable when the principal wants to retain control of the design and/or the design is substantially complete. The contractor appoints their own design consultants to validate certain aspects of the design, participate in value engineering and potentially provide alternative design solutions, however, the contractor does not take on design responsibility.

Early Contractor Involvement (ECI) generally leads to a detailed D&C contract. Typically, an ECI involves two competing contractors and is commonly known as dual or double ECI (dECI). The contractors each align to a designer and the two competing groups develop concept designs and undertake pricing in parallel. By contrast to the ETI model, under ECI the principal may have only reached 10%-30% design maturity and doesn’t want to control the design. The principal provides a clear brief to the contractors (e.g., principal’s project requirements) and actively seeks alternative designs within those parameters. The competitive tension during the concept design phase helps drive innovation to deliver best value for money. After the tender process, one of the competing groups is selected to undertake detailed D&C. ECI is best suited to large, complex projects where a relationship-focused model is preferred, sophisticated risk management and allocation is required, and the contractor’s knowledge and innovation is a key driver for success.

Pros and cons

While the ECI model provides greater value than traditional procurement models, it’s not without pitfalls.

ECI advantages include:

  • Better design and improved constructability, through innovation and technology solutions
  • Improved risk identification, management, and allocation
  • Fewer variations during construction
  • Improved schedule (faster and more certain delivery)
  • Improved understanding and management of community and other stakeholders
  • Interactive process builds the foundation for future project relationships and a less adversarial structure
  • Increased transparency (including in relation to costs and trade/subcontractor pricing)
  • Improved contract documentation and improved understanding of each party’s position and risk profile, therefore reducing the risk of disputes.

ECI disadvantages include:

  • Could be a lack of market appetite due to additional time and costs involved by contractors and a reluctance to tie up key personnel for an extended period
  • Potential schedule risk if negotiations with the ECI participants fail
  • Contractors transfer significant intellectual property and the losing contractor’s IP may be shared with the successful contractor (thus eroding the losing contractor’s commercial advantage on future projects).

Process

An ECI is typically delivered over multiple stages, such as:

  • Stage One – Expression of Interest (EOI)
  • Stage Two – ECI Phase (design development and bid formulation)
  • Stage Three – Award of a fixed price Construct only or detailed Design and Construct contract.

During Stage Two, the contractor, or commonly two to three contractors, are engaged to provide advice on the design under an agreement such as a consultancy agreement or a bespoke ECI Agreement. The agreement will set out information such as the roles and responsibilities of the principal and contractor, the workshop schedule, communication protocols (including how to deal with commercial in confidence information), and document submissions/design reviews. Separate structured meetings and workshops with each contractor are recommended to ensure ideas are shared freely. Each contractor is required to be treated fairly and probity must be maintained. The contractors provide detailed pricing, schedule, and construction options at the end of the ECI phase which can be incorporated into the contract with the successful contractor. Before awarding the Construct only or detailed D&C contract, the principal can stop the project if the project’s business case isn’t feasible, without facing a claim for losses from a contractor that was anticipating taking the project through to construction. Additionally, in the unlikely event that relationships have broken down between the principal and the contractor(s), the principal can continue with the project but competitively tender to include another contractor, with the benefit of ownership of the concept and preliminary design works.

Avoiding pitfalls

While the ECI models are growing in popularity, they don’t suit all projects and should only be selected after a thorough procurement options analysis, including an assessment of the market and the principal’s capability and capacity.

Selecting a contractor early, based largely on non‐price criteria, can at times reduce competition and value for money, but this can be mitigated through evaluating (and locking in) financial parameters, such as margin and unit rates as part of the selection process and by validating open book estimates throughout the process. If an ECI process is adopted, it’s important to begin early enough in the project lifecycle to maximise opportunities for innovation and constructability improvements. Waiting until the design has progressed too far or not being open to innovative ideas limits the value that principals and their designers can derive from the contractor’s knowledge and experience.

From breakdowns to breakthroughs: Regaining supply chain control

-By Henk de Vos, WA/SA/NT Business Manager + Senior Consultant

Blaming supply chain breakdowns on the pandemic has become part of the pandemic vernacular. From manufacturing and warehousing/logistics to stocking shelves and customer service, it seems every layer of the supply chain has been impacted by external factors. Who could have seen this coming? Who would have predicted it would impact everything from toilet paper to chicken nuggets? Senior Consultant and Business Manager at Critical Input Henk de Vos explores how organisations can re-take the reigns.

Blame versus self-determination

The problem with apportioning blame on elements outside the organisation’s control is that it weakens its self-determination or its “internal locus of control”. For the uninitiated, the term, “locus of control” is the degree to which people believe that they, versus external forces beyond their influence, have control over the outcome of events in their lives. SPOILER ALERT: Companies with strong external locusts of control are more successful.

In order to steer the ship, it’s important to regain control, particularly when it comes to aspects that are critical to business continuity. So, we need to ask the question: How many of the world’s supply chain issues stem from lack of planning?

Is it the pandemic or is it the problem?

Arguably, the pandemic has merely exposed pre-existing fault lines that have built up during years where the trend among organisations was to lean down.

Outsourcing non-core goods and services to reduce costs and focus on competencies may achieve the objective of improving bottom lines, but this trend presents additional risks by reducing the ability to predict and determine outcomes. Outsourcing reduces independence because, in order to maintain business continuity, you’re reliant on a third-party.

Treat ‘em mean to keep ‘em lean

In order to become “lean”, an organisation may make staff redundant or redeploy them to other areas of the business. As a result the organisation quickly loses its in-house knowledge and becomes even more dependent on that supplier. The supplier becomes a key business partner, who is not only responsible for the supply of the goods or services but also the associated supply chain planning. As the company has lost its in-house knowledge, it often doesn’t realise what external business factors can impact a supplier’s supply lines down the food chain.

Due to cost pressures, companies are endlessly reviewing operating costs, which means more redundancies, right-sizing, realigning staff and squeezing suppliers on pricing. This focus on the cost-reduction may look good on paper, but it poses a huge risk in loss of knowledge and increased supply chain exposure.

Crises expose risk

The product knowledge is now held by the supplier, not the company. As a result, when the company decides to challenge the current cost, it lacks the experience to clearly specify the required scope of work. If the supplier has something of value or owns relationships of value, the client may find themselves in a position of little power. The tender review becomes focused on the perceived cost, not the intangible benefits required by the business. Incumbent suppliers are often unsuccessful within a competitive tender process as they’ve factored in the real cost of managing the end-to-end process based upon their knowledge. The new supplier often struggles to deliver the required service level, as neither party really understand the required scope or effort to deliver it.

We now have the perfect storm with neither the company nor supplier having the required commodity knowledge. Your non-core commodity has now become critical, as it starts to impact your ability to fulfil your clients’ orders, also known as “revenue”. Cost-savings evaporate, and the blame game begins.

Knowing your supply chain key to riding out the storm

Do you really understand the criticality of your supply chain and the risks associated with your key suppliers, service providers and commodities? While pandemic has impacted the world’s supply chains, some companies have weathered the storm far better than others. These successful companies had the knowledge or built strong supplier partnerships to pre-empt shortages or delays. Often the supplier would advise them of any market changes so that they could amend their forecasts, lock in additional production, or increase their inventory holding. Suppliers tend to support (ie forewarn) key clients with whom they have built a strong business relationship at the cost of the less desirable ones.

As the world becomes increasingly complex, remaining competitive in the future may be less about being lean, but more about being able to maintain a strong internal locus of control within your end-to-end supply chain landscape. Perhaps now is the time to consider detailed supply chain mapping. Critical Input has developed a Supply Chain Review (SCR) function that helps identify risks at all layers to ensure you’ve adequately assessed business risks, particularly those that are critical to business continuity.

Pandemic promises more change to come

Covid-19 caught us all by surprise. It catapulted the world into a level of uncertainty not felt within our lifetimes. At first, there was chaos – people fighting over rolls of toilet paper and supply chains thrown into disarray.  Once the initial shock subsided, for many companies, Covid-19 became the ultimate process improver. According to Managing Director of Critical Input Tim Griffiths, the once in a century pandemic has also provided a once in a lifetime opportunity for positive, meaningful change in the way we work.

“Historically, tragic global disruptors such as WWI and the flu pandemic that followed changed the workplace forever,” he said.

“We saw women enter the workforce and stay there, even after the men came home from war,” he said. “We also saw technologies developed for the war effort, adopted in the post-war workplace.

“As we navigate the future of work and hybrid work, embracing a multitude of perspectives is the key to maximising qualitative and quantitive gains.”

Return to the status quo a wasted opportunity

But it’s not all good news.

“A downside for those who have been in prolonged lockdowns in New South Wales and Victoria is that while the pandemic may have initially sharpened everyone’s pencils, it’s now causing breakdowns in systems and processes,” Tim said.

“To harness the true benefits of remote working, we still need that face-to-face connection.”

Once vaccine levels reach the 80 per cent mark and the economy begins to re-open, Tim predicts businesses will once again enter an era of change, but he believes simply lifting and shifting outdated or ineffective practices in the full-time office to hybrid work will waste the opportunity Covid-19 has provided. 

“Surveys have found that the traditional drivers of productivity such as energy, focus, coordination and cooperation, while expected to suffer during remote working, overwhelmingly improved, however, where lockdowns have been strict and prolonged, we’re observing that things are beginning to falter,” he said.

 “A report into remote working during the pandemic by the NSW Treasury found that most people who could work remotely reported higher productivity but found that collaboration and social isolation were key challenges,”

Building better teams

Video-conferencing technology such as Teams and Zoom, can be used to great effect to alleviate the challenges of social isolation. Many workplaces are employing these tools to make it easier to connect and collaborate.  

“Videoconferencing in some cases has improved access to colleagues and those higher up the chain. It’s much easier to arrange a Teams or Zoom call with 100 people spread across the globe than it is to undertake that in real life,” he said.

“And online trivia afternoons or after-work drinks are just two examples of how businesses are team-building and maintaining social connections between staff from the comfort of their own homes.”

Working remotely has also saved workers an average of one hour and 17 minutes a day in travel time.

“This equates to extra weeks of annual leave, hundreds of dollars in saved travel costs, staff who start work refreshed and who do not need to rush away from their desk in order to start a long journey home.”

Change management made easy

Embracing such a huge change is a challenge, as is looking for creative ways in which to make the most of the once-in-a-lifetime opportunity that Covid-19 presents, Tim said.

Critical Input’s change management expertise enables its team to devise and implement strategies that allow clients to embrace the future and fully explore the positive opportunities open to them.